Our professionals have the experience of having worked on the following projects
Aditivos Mexicanos S.A De C.V. - Chevron de Mexico
Brand owner: Chevron México
Developer and operator: Aditivos Mexicanos S.A. De C.V.
San Juan del Río, Qro., Mexico
Two Warehouses, Laboratory and Offices Buildings, Tanks and Equipment Foundations and Process Pipelines Systems
1991 - 1992
Role: Construction management
Phase: Construction, Phase I
Don Carlos Condo
Brand owner: PINCAD Estudio de Ingeniería y Arquitectura S.A.
Developer and operator: PINCAD Estudio de Ingeniería y Arquitectura S.A.
Santa Cruz, Bolivia
Luxury Apartments
1999 - 2000
Role: Structural Analysis and Design, and Project direction
Phase: Pre-construction (structural design and planning) & Construction.
Integral Construction and Maintenance of Offshore Oil Rigs
Brand owner: PEMEX (Petróleos Mexicanos)
Developer: PEMEX (Petróleos Mexicanos)
Campeche, Gulf of Mexico
Oil rigs and process centers: BACAB-A, AKAL-C, AKAL-C3, BALAM-TA, AKAL-P, AKAL-C6, AKAL-C HABITACIONAL 1, AKAL-C4, AKAL-I, NOHOCH-A (CENTRO DE PROCESO), AKAL-C5, IXTOC-A,
HA-ZAAP-C, E-KU-A1
2009
Role: Project & construction management - COTEMAR, S.A. de C.V.
Phase: Pre-construction & Construction
Túnel Emisor Oriente
Developer: CONAGUA (Comisión Nacional del Agua)
Mexico City, Mexico
Eastern Wastewater Discharge Tunnel
2010 - 2011
Role: Project direction for
Specialized Technological Assistance Services for Excavation Systems used for the construction of the "Túnel Emisor Oriente" - Pöyry (México) S.A. de C.V.
.
Phase: Construction
Sugarcane Bay multi-resort development by Karisma Hotels & Resorts
Brand owner:
Karisma Hotels & Resorts
Developer and operator:
​Karisma Hotels & Resorts
Llandovery, Saint Ann, Jamaica
Macro development for 10 Hotels, Golf, Casino and Amenities
2018 - 2020
Role: Engineering projects direction
Phase: Pre-construction (preliminary infrastructure and urban design), Design & Planning
Nickelodeon - Sensatori Punta Cana Resort
Brand owner:
Nickelodeon Hotels & Resorts
Developer and operator:
​Karisma Hotels & Resorts
Uvero Alto, Punta Cana, D.R.
Nickelodeon Hotels & Resorts Punta Cana
&
Sensatori Punta Cana Resort
2015 - 2016
Role: Engineering projects direction
Phase: Pre-construction, Construction & Commissioning